Next load of driveway stone just showed up.
We also signed the paperwork for the HELOC today. I got shorted on my funds with some nuisance requirements they put on me. Of course these didnt come out till just this past week, and we are so far into the process i really dont want to start over. In short, not happy with the outcome. Should be enough for a barn and slab. The rest I will have to use savings and be frugal.
I met with the elected contractor and discussed a lot of the details. Tentative construction in early to mid July. Confirmed we are going 12' wide on the lean-to now. We are going to have poles in the ground, just cant get away from it for under $8k adder. They will be using glulam poles. We will be putting Tyvek on the sides and Tyvek or Bubble Wrap on the ceiling.
I feel better with my grade work and french drain. That should keep a majority of the moisture and air from the poles.