Every time i stop there its another 2 weeks, so....... its another 2 weeks i guess, lol.
Last time i stopped the crank was out getting machined and re-balanced, believe it or not the engine was together once as a short block, stupid crank was wacking the block though, so some machining on the block and crank was in order. Its getting closer though, lol. He almost scrapped the block because the bore was no where near straight with the crank, hence the reason it had to be bored out for sleaves to straighten the bores. Basically it was working against itself before. I think all the parts are there but not 100% on that.
I'm heading to Sask for some work for a bit so won't be around to see any progress, somewheres about 1hr SW of Kindersley. I'll check on it when i get back. Final compression ratio has to be determined, somewhere between 18:1 and 18.5:1 is a best guess right now. Figures it will handle a ton of boost, like 40 shouldn't be a problem. Not sure on the longevity of it at that though....