So the concrete was poured in our new shop on thursday.
About the time they were just finishing troweling it I realized something.
We forgot to route the floor tubing around where the 2 post lift of supposed to go.
*^%&$)(#$*&%(#)%&$)($$&#($%*$)#$*%)#&*%)$&%(%#*&%(#&%(#*&%)#*&)%*&#)*&%#)&%@(&%)#*&
to say the least.
Hopefully we can make it work but well have to see what the installer has to say.
He said he needed 6" of concrete. Were only going to be able to give him 4 so that we can make sure that we dont pierce the heated floor.
About the time they were just finishing troweling it I realized something.
We forgot to route the floor tubing around where the 2 post lift of supposed to go.
*^%&$)(#$*&%(#)%&$)($$&#($%*$)#$*%)#&*%)$&%(%#*&%(#&%(#*&%)#*&)%*&#)*&%#)&%@(&%)#*&
to say the least.
Hopefully we can make it work but well have to see what the installer has to say.
He said he needed 6" of concrete. Were only going to be able to give him 4 so that we can make sure that we dont pierce the heated floor.